doi: 10.3741/JKWRA.2023.56.10.679


피해규모를 고려한 용수공급시스템 누수복구 우선순위 선정

Determination of a priority for leakage restoration considering the scale of damage in for water distribution systems

  • Kim,Ryul(Master Student, Department of Civil and Infrastructure Engineering, Gyeongsang National University, Jinju, Korea),
  • Kwon,Hui Geun(Master Student, Department of Civil and Infrastructure Engineering, Gyeongsang National University, Jinju, Korea),
  • Choi,Young Hwan(Assistant Professor, Department of Civil and Infrastructure Engineering, Gyeongsang National University, Jinju, Korea)

피인용문헌(Cited by)

피인용문헌 정보가 없습니다.