doi: 10.22696/JKIAEBS.20240035


블로어도어 실험의 데이터 포인트 측정시간 연장에 따른 불확도 영향 분석

Analysis of the Impact of Extended Data Point Measurement Time on Uncertainty in the Blower Door Test

  • Choi,Ji-Hoon(Master Course Student, Department of Architectural Engineering, Graduate School, Kwangwoon University, Seoul, Korea),
  • Kim,Ji-Hye(Assistant Professor, Department of Architectural Engineering, Kwangwoon University, Seoul, Korea)

피인용문헌(Cited by)

피인용문헌 정보가 없습니다.